Concrete Driveway Contractor in Centerville, MN
New concrete driveways built on a solid base, from the oldest streets in town to the newest.
Centerville Driveways, From the Original Downtown to Newer Streets
Centerville has been here since before Minnesota became a state, and its driveways cover just as wide a range of ages. Near the original downtown, a driveway may have been patched, widened, or poured in sections by several owners over the years, leaving seams that heave and split apart each winter. On newer streets, the usual complaints are cracks spreading from the joints and a slab sinking where it meets the garage or the street. Either way, the real problem tends to sit below the surface, in a base that was never built for the job.
As a concrete driveway contractor serving Centerville and nearby Anoka County communities, Cornerstone Concrete starts every job by finding out why the old driveway failed. We tear out down to the base, correct what’s underneath, and pour 4500 PSI concrete graded to move water away from your garage. Then we handle the City and County permits, so the only thing you have to think about is where to park while it cures.

Satisfied Customers
By far one of the easiest companies to work with. My fiancé found them very easy to schedule and communicate with. They did a beautiful job on our new build slab home and shop. Thank You! Thomas & Victoria
Top notch in every way! From the prompt, knowledgeable and kind initial Visit and estimate to the tear out and installation. These guys are the best. The pricing was competitive and the knowledge and workmanship was amazing. Watching them pour our huge driveway was like watching the ballet. The way these guys worked together and clearly enjoying what they were doing was really special to watch.
Our Proven Concrete Driveway Installation Process
Each driveway passes through four stages, and our own crews handle every one. On a Centerville replacement, tear-out is where we learn what the old base was hiding, so set-up can correct it before the forms go in.
1. Tear-Out Process
The first step is removing your existing asphalt or concrete. Any weak or failing sub-base gets dug out with it, leaving solid, well-drained ground to build on.
2. Set-Up Process
Forms are cut and staked to match your driveway’s layout. While they go in, we verify grading, thickness, and slope so water moves off the slab and the driveway holds up long term.
3. Pour Process
Pour day brings a mix selected for strength and durability. Our finishers place it, smooth it, and detail every edge with care.
4. Cut and Clean Process
Once the surface firms up, control joints are cut to manage cracking. We clean the site thoroughly and finish with complimentary dirt and seed, so your property is ready to enjoy.
Because the same company runs every stage, nothing found during tear-out gets lost before the pour. You can see how our driveway installs unfold, stage by stage.
Concrete Work for Centerville Homes
Most Centerville calls are about replacing a worn-out driveway, and many homeowners add a walkway, steps, or a patio at the same time. These are the services we’re asked for most.
Concrete Driveway Installation & Replacement
We remove the old asphalt or concrete, dig out soft or failing base material, and rebuild it with proper compaction and slope. New forms set the shape and thickness, and the finished slab is built to stay level through decades of Minnesota seasons.
Fiber Reinforced Concrete Driveways
Fibers distributed through the concrete reinforce the slab in every direction, from the surface down, which helps limit cracking when the ground shifts with freeze and thaw. It’s part of our standard approach on most driveway projects rather than an add-on.
Maintenance-Free Driveway Mix
Instead of a topical sealer that wears off, we build the protection into the slab as it’s poured, through a specific blend of mix design, additives, and finishing work. You end up with a driveway that has no reseal schedule, no peeling coating, and no upkeep to keep track of, for life.
Amrize Concrete for Residential Driveways
We order engineered mixes from Amrize so every load arrives with the same strength and workability. That consistency carries through to the finished surface, giving you a uniform finish from the street to the garage and a slab that stands up to Minnesota winters.
Add-On Exterior Concrete Services
Planning a patio, garage floor, walkway, steps, apron, or driveway extension? We can pour it alongside your driveway, so the concrete and finish match and the work wraps up as one project instead of two separate jobs on two schedules.
How Centerville Driveway Pricing Works
Most tear-out and replacement driveways we build fall between $10 and $14 per square foot, with larger projects usually costing less per foot. Your number depends on size, access, site conditions, slab thickness, and finish choices, all explained on our Twin Cities driveway pricing page.
That price includes 4500 PSI concrete, fiber reinforcement on most projects, and our maintenance-free mix sealed from within. It also covers graded and compacted base prep, our own crews from tear-out to cleanup, complimentary dirt and seed, and a 3-year workmanship warranty.
We measure every driveway in person, since an older Centerville lot rarely lines up with the standard sizes on a chart.
Permits Behind a Centerville Driveway
Centerville has its own driveway permit, and work in the public right-of-way needs a separate one. We handle both, and you can see the full list on the City of Centerville permits page.
City driveway permit
Centerville has a dedicated Driveway Permit application, and we file it before your project starts. That way, the new driveway is approved before the old one comes out, and nothing stalls once the crew arrives.
Work in the public right-of-way
Digging into or obstructing the City’s right-of-way takes a separate Excavations and Obstructions permit. Driveways often reach into the right-of-way near the street, so we confirm early whether yours needs one and take care of the application.
Driveways on Anoka County roads
If your driveway connects to a county road, such as County Road 14, Anoka County requires an Access Permit for any new driveway. Grading or other work in the county right-of-way needs its own County permit, and we coordinate both.
Why Centerville Homeowners Choose Cornerstone Concrete
Cornerstone Concrete began as a Lecy family business in Stillwater in 1989, and referrals from satisfied homeowners have driven its growth since. Centerville is one of the communities on our service map, along with several Anoka County cities nearby.
One trade, one team
We install concrete and nothing else. The same trained, in-house crews take your driveway from tear-out to final cleanup, so there’s no handoff to subcontractors and one team owns the result.
We file the paperwork
City driveway permits, right-of-way permits, and county access permits are all part of our job. We prepare and submit them, so you never have to visit City Hall or chase an approval.
Quotes broken down line by line
Our typical pricing is public, and your quote lists every item with a realistic timeline. Prefer to pay over time? Ask about flexible concrete financing when we visit.
Covered for three years
Your driveway is backed by a 3-year workmanship warranty. You can review the written warranty before you commit to anything, so you know what’s protected.
Work With a Trusted Concrete Driveway Contractor in Centerville, MN
If your driveway is cracked, sinking at the street, or patched one too many times, we’d be glad to stop by and take a look. We’ll find out what’s going on underneath, handle the permits, and give you an itemized quote with no pressure to decide on the spot. Call (612) 325-3742 or request a free estimate, and we’ll schedule a visit that fits your week.
Centerville Concrete Driveway FAQs
1. What permits does a Centerville driveway need?
The City has its own Driveway Permit, and work that digs into or blocks the public right-of-way needs a separate right-of-way permit. A new driveway onto an Anoka County road also needs a County Access Permit, and we handle every application for you.
2. Why is my old driveway sinking near the street or garage?
Settling usually traces back to a weak or poorly compacted base, or water collecting under the slab. Patching the surface won't fix either one, which is why we dig out and rebuild the base before pouring new concrete.
3. When can I park on my new driveway?
Give it 24 hours before walking on it and 10 days before parking a car on it. That gives the concrete time to reach the strength it needs for vehicle weight.
4. Do I need to seal a new concrete driveway?
Not with ours. The mix seals itself from the inside during the pour, while typical concrete driveways need resealing every 2 to 3 years.
5. Can you match a new walkway or patio to my driveway?
Yes. We can pour a patio, walkway, steps, or driveway extension as part of the same project, so the concrete and finish match from one surface to the next.


